Paver Patios, Driveways and Walkways in Clemson
Jessamine Landscaping lays paver patios and walkways in Clemson, 16 miles from our Anderson base. Before the first paver goes down, we dig it out, set and compact a gravel base and plan where the water drains. A weak base is how pavers sink and shift. Call, and we'll come up and price it for free.
Call 864-633-4524 for a Free EstimateHow much does paver installation cost in Clemson?
The price follows the square footage, how much ground has to be dug out, the base the ground needs, the paver you pick, how much slope and drainage work the yard calls for, and how accessible the project site is. Upstate red clay holds water, so the base and drainage get the work before the pavers do. Estimates are free, and you get the number after we see the yard.
Rather not call? Submit a form and tell us about the job.
Turning loose gravel into a paver patio in Clemson
Got loose gravel off your back steps in Clemson? That's where a patio wants to go.
A gravel yard already has the shape of a patio. Pavers give chairs and a table a flat, solid floor, and we'll come out and measure the spot.

What we've built in Clemson
- Clemson is 16 miles from our Anderson base.
- Lex Espinoza, who owns Jessamine Landscaping, is a Clemson grad.
- We strung bulb lights on new wood posts down a gravel side yard here, from the back deck stairs to the tree line.
Common Questions
Will the patio slope away from my house?
Yes. Water has to leave the patio and move away from the house, so the slope is set before the first paver goes down. We plan proper water drainage into every paver job.
Do you fill low spots with dirt or stone?
Stone, packed down in layers. Dirt keeps compressing under a patio and leaves a dip. Filling low spots with the right material is part of proper base prep.
"Easily one of the best hardscaping companies, they did a great job with my families paver patio and retaining wall."
Dayjuan D.
How We Work
- Decades of experience. We bring decades of experience to every paver patio, driveway and walkway.
- Base prep first. Proper materials and base prep under every paver, because the base decides how long the job lasts.
- Proper water drainage. The slope and drainage are planned before the first paver goes down, so water leaves the patio.
